Slopes at the Silvretta Arena in Ischgl/Samnaun

Last update: *
Status Type Name Map
N7 Alp Trida Förderband
Journey time
1 min.
Speed
0.6 m/s
Drive capacity
3 kW
Year of construction
2003

N5 Alp Trider Ecklift
Status Type/Nr. Piste Details
E 69 Alp Trida Eck - Alp Trida
E 69a Alp Trida Eck - Alp Trida
Journey time
3.9 min.
Speed
2.5 m/s
Drive capacity
49 kW
Year of construction
1991

N6 Alp Trider Sattelbahn
Status Type/Nr. Piste Details
E 69 Alp Trida Eck - Alp Trida
M 69b Alp Trida Eck - Alp Trida
Journey time
3.4 min.
Speed
5 m/s
Drive capacity
318 kW
Year of construction
2000

Built in 2000, the detachable chair lift has weather protection bubbles, a total capacity of 2.800 persons per hour and 60 six-person chairs, which travel 1.050 m over 10 pillars up to the mountain station.

O2 Blais Grondalift
Status Type/Nr. Piste Details
E 71 Viderjochbahn mountain - Alp Trida Eck
Journey time
3.6 min.
Speed
3.1 m/s
Drive capacity
87 kW
Year of construction
1980

E3 Bodenalpbahn
Status Type/Nr. Piste Details
M 36 Paznauner Thaya - Bodenalp
M 37 Bodenalpbahn mountain - A3 middle station
Journey time
5 min.
Speed
2.4 m/s
Drive capacity
190 kW
Year of construction
2000

L1 Double-decker aerial tramway
Journey time
5.7 min.
Speed
10 m/s
Drive capacity
1,250 kW
Year of construction
1995

The Twinliner in Samnaun is one of the largest aerial cable cars in the Alps, featuring two double-decker gondolas with a total capacity of 180 passengers, with 110 passengers traveling in the upper and 70 passengers traveling in the lower gondola. The cableway runs with a max. ground clearance of 210 m over 3 pillars from Samnaun to Alp Trider Sattel. Built in 1995, the aerial cableway has a vertical rise of 722 m, a route distance of 2.300 m and a total capacity of 1.620 persons/hour. Maximum speed is 10 m/s, rope diameter is 64mm.

A3 Fimbabahn
Status Type/Nr. Piste Details
M 1 Idalp - middle station Silvrettabahn A1
M 1. middle station Silvrettabahn A1 - Ischgl
M 1a valley run - Pardatschgrat
Journey time
15.1 min.
Speed
5 m/s
Drive capacity
770 kW
Year of construction
2007

B2 Flimjochbahn
Status Type/Nr. Piste Details
S 9 Flimjoch Mountain - Idalp
M 10 Flimjoch - Idalp
E 11 Idjoch - Idalp
Journey time
6.5 min.
Speed
5 m/s
Drive capacity
612 kW
Year of construction
2016

The detachable chair lift departs at 2,302 m above sea level (Idalp) and runs over 16 pillars to the Viderjoch, located at 2,756 m altitude. In winter, this facility is mainly used to support the Idjoch 8-person chair lift. The 87 chairs are equipped with comfortable seat covers, seat heating and weather protection bubbles. The facility has a total capacity of 3,200 m persons per hour. The Flimjochbahn operates from the mountain station, has a vertical rise of 454 m and a route distance of 1,797 m. Built in 2016, this lift facility boasts an average of 1,2 Mio. trips per winter season.

N1 Flimsattelbahn
Status Type/Nr. Piste Details
E 62 Viderjoch - Alp Trida
M 62a Viderjoch - Alp Trida
Journey time
9 min.
Speed
5 m/s
Drive capacity
577 kW
Year of construction
1994

The Flimsattelbahn has a vertical rise of 490 m and a route distance of 2.727 m. It departs from the base station (2.265 m) and runs over 29 pillars up to an altitude of 2.755 m. The 186 chairs are equipped with weather protection bubbles. Constructed in 1994, this facility has a total capacity of 2.400 passengers/hour. 1,1 Mio. guests per winter season use this facility mainly on their way back to Idalp from Alp Trida. The rope has a diameter of 45mm.
 

P2 Förderband Musella 1
Journey time
1 min.
Speed
0.6 m/s
Drive capacity
6 kW
Year of construction
2012

P3 Förderband Musella 2
Journey time
1 min.
Speed
0.7 m/s
Drive capacity
6 kW
Year of construction
2012

B9 Förderband Übungsareal
Status Type/Nr. Piste Details
E 6 Pardatschgrat - Idalp
Journey time
1.5 min.
Speed
0.9 m/s
Drive capacity
11 kW
Year of construction
2011

B10 Förderband Viderböden
Status Type/Nr. Piste Details
E 2 Idalp - Höllboden
E 11 Idjoch - Idalp
Journey time
1.5 min.
Speed
0.9 m/s
Drive capacity
11 kW
Year of construction
2011

E4 Gampenbahn
Status Type/Nr. Piste Details
S 39 Palinkopf - Gampenalp
M 40 Palinkopf - Gampenalp
S 40a Gampenalp
M 40a Palinkopf - Gampenalp
E 40b Gampenbahn valley - Bodenalpe
M 40c Gampenalp
S 41 Palinkopf - Piz Val Gronda Tal
S 41. Palinkopf - Piz Val Gronda Tal
Journey time
7.87 min.
Speed
5.5 m/s
Drive capacity
1,041 kW
Year of construction
2018

B8 Gratbahn
Status Type/Nr. Piste Details
E 6 Pardatschgrat - Idalp
Journey time
3.2 min.
Speed
5 m/s
Drive capacity
420 kW
Year of construction
2002

O1 Greitspitzbahn
Status Type/Nr. Piste Details
E 64 Idjoch - Alp Trida Eck
M 70 Greitspitze - Salaas
M 70a Greitspitze - Alp Trida Eck
S 72 Greitspitze - 72a
M 72a Idjoch - Alp Trida Eck
Journey time
4.7 min.
Speed
5 m/s
Drive capacity
598 kW
Year of construction
1998

B4 Greitspitzlift
Status Type/Nr. Piste Details
S 13 start piste eleven
M 14 Greitspitze - Idjoch
Journey time
3.5 min.
Speed
2.6 m/s
Drive capacity
75 kW
Year of construction
1980

M1 Grivaleabahn
Status Type/Nr. Piste Details
M 61 Grivaleabahn valley - Samnaun Compatsch
M 76 Grivaleabahn mountain - Gravaleabahn valley
Journey time
5.3 min.
Speed
4.8 m/s
Drive capacity
432 kW
Year of construction
1996

C1 Höllbodenbahn
Status Type/Nr. Piste Details
E 2 Idalp - Höllboden
Journey time
3.4 min.
Speed
4.5 m/s
Drive capacity
410 kW
Year of construction
2000

C2 Höllkarbahn
Status Type/Nr. Piste Details
E 23 Palinkopf valley - Höllboden
M 24 Höllkarbahn mountain - Höllkarbahn valley
Journey time
5.5 min.
Speed
5 m/s
Drive capacity
560 kW
Year of construction
1998

E2 Höllspitzbahn
Status Type/Nr. Piste Details
M 32 Höllspitz - Restaurant Schwarzwand
S 34 Höllspitz - Paznauner Thaya
S 35 Höllspitz - Paznauner Thaya
Journey time
6 min.
Speed
5 m/s
Drive capacity
620 kW
Year of construction
1994

B3 Idjochbahn
Status Type/Nr. Piste Details
E 11 Idjoch - Idalp
M 12 Idjoch - Höllboden
Journey time
6 min.
Speed
5 m/s
Drive capacity
745 kW
Year of construction
2001

C5 Lange Wandbahn