The Twinliner in Samnaun is one of the largest aerial cable cars in the Alps, featuring two double-decker gondolas with a total capacity of 180 passengers, with 110 passengers traveling in the upper and 70 passengers traveling in the lower gondola. The cableway runs with a max. ground clearance of 210 m over 3 pillars from Samnaun to Alp Trider Sattel. Built in 1995, the aerial cableway has a vertical rise of 722 m, a route distance of 2.300 m and a total capacity of 1.620 persons/hour. Maximum speed is 10 m/s, rope diameter is 64mm.
L2
Luftseilbahn
Journey time
6 min.
Speed
10 m/s
Drive capacity
686 kW
Year of construction
1978
E5
Piz Val Grondabahn
Status
Type/Nr.
Piste
Details
S
41
Palinkopf - Piz Val Gronda Tal
M
42
Piz Val Gronda Bergstation - Piz Val Gronda Talstation
Journey time
5.4 min.
Speed
12 m/s
Drive capacity
620 kW
Year of construction
2013
A1
Silvrettabahn
Status
Type/Nr.
Piste
Details
M
1a
valley run - Pardatschgrat
M
1
Idalp - middle station Silvrettabahn A1
M
1.
middle station Silvrettabahn A1 - Ischgl
Journey time
11 min.
Speed
6 m/s
Drive capacity
2,810 kW
Year of construction
1998
The Silvrettabahn was constructed in summer 1998. It boasts a vertical rise of 961 m, a route distance of 3.938 mand a maximum capacity of up to 3.440 persons/hour. The middle station is located at 1.683 m above sea level. 1,4 Mio. guests per winter season use the facility.
Its 24-passenger bicable ropeway design (funitel system) facilitates safe operation even at wind speeds of 100 km/h. 63 gondolas run from Ischgl to Idalp with a maximum line speed of up to 6 m/s.
The transport system has a total of 23 pillars with a height of up to 23 m. 8 motors with a total capac i ty of 3.200 kW (4.350 PS) are required for the operation of the Silvrettabahn.
F2
Pardoramabahn
Status
Type/Nr.
Piste
Details
S
4
F1 mountain - middle station A2
M
5
Pardatschgrat Westabf. - middlestation A2
M
5a
Pardatschgrat
Journey time
5.4 min.
Speed
5 m/s
Drive capacity
617 kW
Year of construction
1990
A3
Fimbabahn
Status
Type/Nr.
Piste
Details
M
1
Idalp - middle station Silvrettabahn A1
M
1.
middle station Silvrettabahn A1 - Ischgl
M
1a
valley run - Pardatschgrat
Journey time
15.1 min.
Speed
5 m/s
Drive capacity
770 kW
Year of construction
2007
B2
Flimjochbahn
Status
Type/Nr.
Piste
Details
S
9
Flimjoch Mountain - Idalp
M
10
Flimjoch - Idalp
E
11
Idjoch - Idalp
Journey time
6.5 min.
Speed
5 m/s
Drive capacity
612 kW
Year of construction
2016
The detachable chair lift departs at 2,302 m above sea level (Idalp) and runs over 16 pillars to the Viderjoch, located at 2,756 m altitude. In winter, this facility is mainly used to support the Idjoch 8-person chair lift. The 87 chairs are equipped with comfortable seat covers, seat heating and weather protection bubbles. The facility has a total capacity of 3,200 m persons per hour. The Flimjochbahn operates from the mountain station, has a vertical rise of 454 m and a route distance of 1,797 m. Built in 2016, this lift facility boasts an average of 1,2 Mio. trips per winter season.
B3
Idjochbahn
Status
Type/Nr.
Piste
Details
E
11
Idjoch - Idalp
M
12
Idjoch - Höllboden
Journey time
6 min.
Speed
5 m/s
Drive capacity
745 kW
Year of construction
2001
N2
Visnitzbahn
Status
Type/Nr.
Piste
Details
M
65
Visnitzbahn mountain - Alp Trida
M
65a
Visnitzbahn mountain - Alp Trida
M
67
Mullerbahn mountain - Alp Trida
Journey time
4.5 min.
Speed
5 m/s
Drive capacity
600 kW
Year of construction
2019
C1
Höllbodenbahn
Status
Type/Nr.
Piste
Details
E
2
Idalp - Höllboden
Journey time
3.4 min.
Speed
4.5 m/s
Drive capacity
410 kW
Year of construction
2000
B1
Velillbahn
Status
Type/Nr.
Piste
Details
M
7
Velilltal - Velilleckbahn valley
E
8
Velillbahn mountain - Idalp
Journey time
4.9 min.
Speed
5 m/s
Drive capacity
470 kW
Year of construction
1995
C2
Höllkarbahn
Status
Type/Nr.
Piste
Details
E
23
Palinkopf valley - Höllboden
M
24
Höllkarbahn mountain - Höllkarbahn valley
Journey time
5.5 min.
Speed
5 m/s
Drive capacity
560 kW
Year of construction
1998
N4
Viderjochbahn 1
Status
Type/Nr.
Piste
Details
E
63
Idjoch - Alp Trida
Journey time
5.2 min.
Speed
5 m/s
Drive capacity
522 kW
Year of construction
2003
C3
Sassgalunbahn
Status
Type/Nr.
Piste
Details
M
25
Sassgalun - Höllboden
Journey time
3.5 min.
Speed
1.8 m/s
Drive capacity
160 kW
Year of construction
1997
C4
Nachtweidebahn
Status
Type/Nr.
Piste
Details
M
2a
Idalp - Nachtweide valley
E
2b
ideal for beginners
Journey time
6.1 min.
Speed
4.5 m/s
Drive capacity
470 kW
Year of construction
2004
N6
Alp Trider Sattelbahn
Status
Type/Nr.
Piste
Details
E
69
Alp Trida Eck - Alp Trida
M
69b
Alp Trida Eck - Alp Trida
Journey time
3.4 min.
Speed
5 m/s
Drive capacity
318 kW
Year of construction
2000
Built in 2000, the detachable chair lift has weather protection bubbles, a total capacity of 2.800 persons per hour and 60 six-person chairs, which travel 1.050 m over 10 pillars up to the mountain station.