August 2014 - Route
ISCHGL
checking and adjusting work
- Alucopond facade work
- assembly of the wood lesenes at the facade
- bituminisation work in the station area
- industrial flooring in the storage and gondola circulation area
- assembly of illumination
- sound hood for the drive unit
More posts
0
Interested?
Suggested entries
read more
Take part and win!
Take part in our survey and with a little luck win a holiday in Austria!