The Silvrettabahn was constructed in summer 1998. It boasts a vertical rise of 961 m, a route distance of 3.938 mand a maximum capacity of up to 3.440 persons/hour. The middle station is located at 1.683 m above sea level. 1,4 Mio. guests per winter season use the facility.
Its 24-passenger bicable ropeway design (funitel system) facilitates safe operation even at wind speeds of 100 km/h. 63 gondolas run from Ischgl to Idalp with a maximum line speed of up to 6 m/s.
The transport system has a total of 23 pillars with a height of up to 23 m. 8 motors with a total capac i ty of 3.200 kW (4.350 PS) are required for the operation of the Silvrettabahn.
A2
Pardatschgratbahn
Status
Type/Nr.
Piste
Details
M
1a
valley run - Pardatschgrat
S
4
F1 mountain - middle station A2
M
5
Pardatschgrat Westabf. - middlestation A2
M
5a
Pardatschgrat
Journey time
9.4 min.
Speed
7.5 m/s
Drive capacity
1,880 kW
Year of construction
2014
A3
Fimbabahn
Status
Type/Nr.
Piste
Details
M
1
Idalp - middle station Silvrettabahn A1
M
1.
middle station Silvrettabahn A1 - Ischgl
M
1a
valley run - Pardatschgrat
Journey time
15.1 min.
Speed
5 m/s
Drive capacity
770 kW
Year of construction
2007
B1
Velillbahn
Status
Type/Nr.
Piste
Details
M
7
Velilltal - Velilleckbahn valley
E
8
Velillbahn mountain - Idalp
Journey time
4.9 min.
Speed
5 m/s
Drive capacity
470 kW
Year of construction
1995
B10
Förderband Viderböden
Status
Type/Nr.
Piste
Details
E
2
Idalp - Höllboden
E
11
Idjoch - Idalp
Journey time
1.5 min.
Speed
0.9 m/s
Drive capacity
11 kW
Year of construction
2011
B5
Sonnenbahn
Status
Type/Nr.
Piste
Details
E
6
Pardatschgrat - Idalp
Journey time
2.8 min.
Speed
5 m/s
Drive capacity
197 kW
Year of construction
2011
B6
Übungslift Velill
Status
Type/Nr.
Piste
Details
E
6
Pardatschgrat - Idalp
Journey time
2.5 min.
Speed
2.5 m/s
Drive capacity
16 kW
Year of construction
1995
B7
Übungslift Viderböden
Status
Type/Nr.
Piste
Details
E
11
Idjoch - Idalp
Journey time
1.3 min.
Speed
2.5 m/s
Drive capacity
12 kW
Year of construction
1996
B8
Gratbahn
Status
Type/Nr.
Piste
Details
E
6
Pardatschgrat - Idalp
Journey time
3.2 min.
Speed
5 m/s
Drive capacity
420 kW
Year of construction
2002
B9
Förderband Übungsareal
Status
Type/Nr.
Piste
Details
E
6
Pardatschgrat - Idalp
Journey time
1.5 min.
Speed
0.9 m/s
Drive capacity
11 kW
Year of construction
2011
C1
Höllbodenbahn
Status
Type/Nr.
Piste
Details
E
2
Idalp - Höllboden
Journey time
3.4 min.
Speed
4.5 m/s
Drive capacity
410 kW
Year of construction
2000
C2
Höllkarbahn
Status
Type/Nr.
Piste
Details
E
23
Palinkopf valley - Höllboden
M
24
Höllkarbahn mountain - Höllkarbahn valley
Journey time
5.5 min.
Speed
5 m/s
Drive capacity
560 kW
Year of construction
1998
C3
Sassgalunbahn
Status
Type/Nr.
Piste
Details
M
25
Sassgalun - Höllboden
Journey time
3.5 min.
Speed
1.8 m/s
Drive capacity
160 kW
Year of construction
1997
C4
Nachtweidebahn
Status
Type/Nr.
Piste
Details
M
2a
Idalp - Nachtweide valley
E
2b
ideal for beginners
Journey time
6.1 min.
Speed
4.5 m/s
Drive capacity
470 kW
Year of construction
2004
E1
Paznauner Thayabahn
Status
Type/Nr.
Piste
Details
M
30
Sassgalun - Paznauner Thaya
M
31
Sassgalun - Paznauner Thaya
Journey time
4.2 min.
Speed
5 m/s
Drive capacity
385 kW
Year of construction
2003
E3
Bodenalpbahn
Status
Type/Nr.
Piste
Details
M
36
Paznauner Thaya - Bodenalp
M
37
Bodenalpbahn mountain - A3 middle station
Journey time
5 min.
Speed
2.4 m/s
Drive capacity
190 kW
Year of construction
2000
F1
Velilleckbahn
Status
Type/Nr.
Piste
Details
S
4
F1 mountain - middle station A2
S
4a
Velilleckbahn mountain - Velilleckbahn valley
M
7
Velilltal - Velilleckbahn valley
S
7a
Velilleckbahn valley - Pardatschgrat valley
S
7a.
Velill valley
Journey time
5.9 min.
Speed
6 m/s
Drive capacity
661 kW
Year of construction
2019
F2
Pardoramabahn
Status
Type/Nr.
Piste
Details
S
4
F1 mountain - middle station A2
M
5
Pardatschgrat Westabf. - middlestation A2
M
5a
Pardatschgrat
Journey time
5.4 min.
Speed
5 m/s
Drive capacity
617 kW
Year of construction
1990
G2
Schwarzwasserlift
Status
Type/Nr.
Piste
Details
M
37
Bodenalpbahn mountain - A3 middle station
Journey time
4.5 min.
Speed
2.5 m/s
Drive capacity
19 kW
Year of construction
1999
L1
Double-decker aerial tramway
Journey time
5.7 min.
Speed
10 m/s
Drive capacity
1,250 kW
Year of construction
1995
The Twinliner in Samnaun is one of the largest aerial cable cars in the Alps, featuring two double-decker gondolas with a total capacity of 180 passengers, with 110 passengers traveling in the upper and 70 passengers traveling in the lower gondola. The cableway runs with a max. ground clearance of 210 m over 3 pillars from Samnaun to Alp Trider Sattel. Built in 1995, the aerial cableway has a vertical rise of 722 m, a route distance of 2.300 m and a total capacity of 1.620 persons/hour. Maximum speed is 10 m/s, rope diameter is 64mm.